        COSTCO质量审核流程:
        审核不是通过/不通过。 审核的目的是为了持续改善, 分数是为了帮助引导工厂做一些改变。
        AUDIT PROCESS(for audit result only desk review)审核流程(初审+文审):
        *CS schedule after receiving GMP Audit Request Form from Costco within 30days. 
        收到Costco 的GMP Audit Request Form  后, SGS CS (客服)开始排期( 从收到Request 算起,要求30 天内完成审核)。
        *Factory fill materials , pay audit fee and inform SGS CS on the wrong information on GMP request form, SGS CS need tell Costco before audit. 
        工厂填写资料,付款,并通知SGS CS 在GMP Audit Request Form 上的错误信息 ,SGS CS 需要在审核之前通知Costco。
        *Auditor audit factory and submit report

        审核员审核工厂并提交审核报告

        TR team release report to Costco and payer (within 5 Working Days after on site audit) 
        技术评审组把报告发给Costco 和付款方( 审核后的5 个工作日内)
        *DR send email to factory for corrective evidence (3 chances for 30 days after on site audit )
        文审组发邮件给工厂提交整改证据( 工厂在审核后的30 天内有3 次提交机会)。
        *DR will review and approve the corrective evidence within 30 days, then send to Costco for further approval after all findings are closed, If not, factory will not be active in Costco system. 

        文审组会在30 天内评估和批准整改证据,全部关闭后,提交给Costco 做最终批准, 否则,工厂在Costco 的系统里还是未被激活的。

        *Auditor will be arranged for partial re-audit after desktop review based on factory audit result which need partial re-audit (within 1-3 months after initial on site audit ).
        根据工厂的审核结果需要现场跟进的,则文审后( 如果30 天完成不了文审,可以不关闭所有问题点,直接实施跟进审核 ),审核员会被安排实施现场跟进审核( 现场审核后的1-3 个月内完成跟进) 。
        *Auditor conduct partial re-audit and submit report 
        审核员实施跟进审核(如果工厂审核当天可以完成整改,则NC 也可关闭,最终工厂不能关闭的NC 才保留下来),并提交审核报告。
        *TR team release report to Costco and payer (within 5 Working Days after on site audit) 
        技术评审组把报告发给Costco 和付款方( 审核后的5 个工作日内)。
        *DR send email to factory if there are findings exist 
        如果还有不符合项,文审组发邮件给工厂提交继续提交整改证据。
        *DR will review and approve the corrective evidence within 30 days, then send to Costco for further approval after all findings are closed, If not, factory will not be active in Costco system. 
        文审组会在30 天内评估和批准整改证据,全部关闭后,提交给Costco 做最终批准, 否则,工厂在Costco 的系统里还是未被激活的。
        *Auditor will be arranged for full re-audit after desktop review based on factory audit result which need full re-audit (within 1-3 months after initial on site audit ). 
        根据工厂的审核结果需要重审的,则文审后审核员会被安排实施重审( 现场审核后的1-3 个月内完成跟进) 。
        *Auditor conduct full re-audit and submit report 
        审核员实施重审并提交审核报告。
        *TR team release report to Costco and payer (within 5 Working Days after on site audit)
        技术评审组把报告发给Costco 和付款方( 审核后的5 个工作日内)。
        *DR send email to factory if there are findings exist  
        如果还有不符合项,文审组发邮件给工厂提交继续提交整改证据。
        *DR will review and approve the corrective evidence within 30 days, then send to Costco for further approval after all findings are closed, If not, factory will not be active in Costco system.

        文审组会在30 天内评估和批准整改证据,全部关闭后,提交给Costco 做最终批准, 否则, 工厂在Costco 的系统里还是未被激活的。


        Reminding提醒:
        1. If factory delay for any longer than required amount of time based on the audit score to conduct any sort of CAP/ partial re-audit, a full re-audit maybe required. 
        基于审核的分数, 如果迟于所要求的完成时间实施CAP review或partial re-audit
(现场跟进),可能会被要求安排重审。
        2. DR will review and approve the corrective evidence within 30 days, then send to Costco for further approval after all findings are closed, If not, factory will not be active in Costco system. 

        全部不符合项关闭后,SGS DR 才可以提交给Costco 做最终批准, 否则,工厂在Costco的系统里还是未被激活的。

浙江验厂网作为受认可的第三方验证机构和培训机构(VB, Verification Body),拥有丰富的验厂认证咨询经验,可以提供众多项目的验厂认证辅导服务。我们的服务宗旨是“专业辅导+良好人脉”双保险确保工厂快速通过验厂,专为工厂解决验厂中遇到的各种难解之题;强大的顾问团队,优质的服务口碑,验厂关系通全国、可提前安排审核,现场公关、审核时间查询;通过后付款,选择浙江验厂网-任何原因导致验厂不通过,我们负责到底!

24小时免费咨询热线:

400-008-6006
社会责任验厂   反恐验厂   质量验厂
立即咨询 半小时内响应

中国验厂网:服务保障,权威保障,时间保障,费用保障

服务支持 400-008-6006 周一至周六 09:00~20:00 售后服务/投诉处理